Mechanical contractor welding a large pipe flange
MCAA Labor Hours

MCAA Labor Hours

Bring MCAA Labor Hours directly into your operations.

HPH maps your material catalog to MCAA Labor Hours so every estimate, change order, and labor plan includes industry-standard labor hours.

Workflow Integration

Labor Hours to Power Your Preconstruction and Construction Workflows

Standardized labor hours reduce estimating time, improve consistency, ensure accurate bids, and provide defensible documentation throughout the project lifecycle.

Bidding / Estimating

Pull accurate MCAA labor hours directly into your bids. Eliminate manual lookups and build estimates faster with standardized, industry-recognized hour values tied to every scope item.

Change Orders

Back every change order with documented MCAA labor hours. Speed up approval cycles and reduce disputes by grounding scope additions in a published, universally accepted standard.

Labor Planning

Translate project scope into credible crew schedules. Use MCAA hours to forecast labor demand, set production targets, and measure field performance against a reliable benchmark.

MCAA Standards

Two Types of MCAA Labor Hours

The MCAA publishes two distinct labor hour standards to provide contractors options in how they work with labor hours. HPH delivers both.

Component

Single unit for each item

Component Labor Hours are assigned to individual pipe fittings, valves, hangers, and other discrete items. Each unit carries a published hour value so your estimate builds automatically as your bill of materials grows. Ideal for piping and mechanical scopes where counts drive the takeoff.

  • Time-tested method for defining labor hours
  • Ideal for use in job estimates
  • Apply factors to adjust for job and crew conditions

Work Activity

Labor hours for all common activities for installing items

Work Activity Labor Hours capture the time required to perform a specific task relating to the installation of a product. Multiple activities are required to complete the installation and testing of materials. Examples include pipe cuts, joints, and material handling. This method more accurately captures just the tasks and reduces the need for correction factors for conditions such as back-to-back fittings.

  • Task-driven rather than a single total value
  • Ideal for use in Fab Shop labor planning
  • Supports joint-based estimating
Process

How It Works

HPH links your existing item catalog to MCAA Labor Hours using our proprietary Item Code system—a one-time mapping that pays dividends on every future estimate.

  1. 01

    Connect Your Existing Database

    Share your current item database—whether it lives in an estimating platform, ERP, or a custom catalog. We accept standard export formats and work with your existing structure.

  2. 02

    HPH Maps Items to Item Codes

    Our team assigns HPH Item Codes to each entry in your catalog. These codes bridge your proprietary item descriptions and the MCAA Labor Hour tables, creating a permanent, reusable link.

  3. 03

    Labor Hours Flow Automatically

    Once mapped, every item in your database carries its corresponding MCAA labor hours. Pull hours into estimates, change orders, and plans without manual lookups—the link is persistent and always current.

FAQs

Frequently Asked Questions

Do I need to be approved by the MCAA to access their hours?

Yes, you must either be a member of the MCAA or have purchased a WebLEM subscription before HPH can turn on the labor hours.

What are the HPH requirements to access the MCAA hours?

There is no additional charge when using the MCAA hours on the HPH platform. If you want to use the MCAA Labor Hours and HPH Item Codes in other systems, you will need to obtain an HPH Enterprise License.

How much does the HPH MCAA labor unit service cost?

The annual fee of $5,000 provides access to hours for the first 75,000 catalog items. For larger catalogs, a per-item fee will be charged after the first 75,000.

Can I integrate the labor hours with my Fab Shop or Takeoff software?

Yes, HPH can assist you with connecting your software to the MCAA Hours using our services.

Can you put the MCAA labor hours in my Autodesk ESTmep database?

Once your database has HPH Item Codes linked to the items in your Autodesk Mapprod file, HPH can provide you an Excel file to update the labor hours in the Installation Hours table.

Can you put the MCAA labor hours in my Autodesk Revit?

Revit does not have a centralized database to place the labor hours. However, you can attach MCAA labor hours and vendor pricing to items in each Revit model using the HPH platform.

Can I combine the Work Activity Pipe Cuts with the Component Hours for Pipe?

No, the MCAA clearly states that the Work Activity hours should not be used in conjunction with the Component hours.

Are the labor hours updated when MCAA releases an update?

Yes. When MCAA publishes an update to the labor hour tables, HPH updates the dataset and pushes the changes to your mapped catalog. You always have access to the current published values without needing to re-map your items on the HPH platform.

Talk to HPH

Bring MCAA Labor Hours Into Your Workflow

Tell us where your catalog lives and how your team uses labor hours. We’ll help you understand the mapping process, requirements, and best delivery option.

HPH News

Market News – Copper August 2026

Copper Pricing – Commodity Market Earlier this week, the commodity price for Copper set an all-time high. Market…

Request Info
Our Location

995 Industrial Park Road
Littleton NH 03561

Call Us

800.890.0820

Join Our Mailing List

Privacy Preference Center